For concrete surfaces requiring a level, smooth underlayment prior to installing final flooring (tile, carpet, resilient floorings). Walk on in 4 hours, install final floor covering within 5 to 8 hours. Must be used with Basalite "Prime Seal" to ensure bond and maximize coverage.
Pallet Count | Weight |
---|---|
- | 5 lbs. (6/box) |
- | 10 lbs. (4/box) |
48 | 55 lbs. |
One 55 lb. sack covers approximately 20.0 ft2 at 1/4 inch thick.